Home > News > Industry News > BOLN high-speed rail line plan.....
Browse Categories
Diamond Segments(145)
Stone Cutting Tools(219)
Stone Grinding & Polishing Tools(963)
Stone Drilling Tools(144)
Concrete Cutting Tools(47)
Concrete Grinding and Polishing Tools(531)
Concrete Drilling Tools(30)
Ceramic Diamond Tools(27)
Vacuum Brazed Diamond Tools(73)
Machinery and Other Tools(174)
Abrasive Tools(1)
Other Tools Category(108)
Cuting,grinding,polishing and drilling tools(754)
Hot-sale Products
Contact us
Contact us: Fujian Nanan Boreway Machinery Co.,Ltd. ADD: HuaHui Center, Shuitou Town,Quanzhou, Fujian, China, ...
Contact Now
Latest News

What are the effects of stone processing?

What products can stone be processed into? Stone can be made of a wide range of products, as long as wood can be made, stone can also be made, and the hardness and effect are better than wooden products, more atmospheric, and longer life.
What are the effects of processing the stone surface? What is the function of fixed thickness?

What is the thickness of the base of the ultra-thin saw blade?

Ultra-thin diamond saw blade refers to high-precision special-purpose diamond cutting blade.According to different bonding agents, the production is divided into metal bonding agents, resin bonding agents and electroplated diamond cutting blades.

How to use corrugated ceramic saw blade correctly?

Ceramic Blade Disc is a particularly stable and mature diamond saw blade, especially suitable for cutting ceramics, porcelain.

How to protect yourself against the epidemic?

Boreway will continue to provide customers with comfortable services,high-quality dry-cut small saw blades,multi-size saw blades,Litchi surface grinding disc for grinding concrete and other products.

What should diamond tools know?

A diamond tool is nominally a tool for making diamonds, and then a tool for consolidating diamond with a binder to have a certain shape, structure, and size is a diamond tool.
Among them, common diamond abrasive pastes, rolling saw blades, cold-embedded diamond wire drawing dies, cold-embedded diamond tools, brazed diamond composite blade tools, etc., are all kinds of diamond tools.

What is the difference between wet and dry cutting of diamond saw blades?

In recent years, with the increasing range of applications of diamond circular saw blades, diamond circular saw blades have been stimulated to develop...

What are the key technologies for diamond tool manufacturing?

Due to the hardness of diamond tools High, good wear resistance, High thermal conductivity, low coefficient of friction and thermal expansion, strong ...

What polishing methods do abrasive mills have?

The polishing in plastic mold processing is very different from the surface polishing required in other industries. Strictly speaking, the polishing o...

News

BOLN high-speed rail line plan introduced, the train running time, freshly baked, operating into the

  • Author:Chois Dong
  • Source:Www.boreway.com
  • Release on:2017-06-13
Lanzhou Railway Bureau 13 disclosure, BOLN high-speed rail motor train program was officially introduced, the train is also running out of fresh time, marking the opening of BOLN high-speed rail operation, into the countdown stage.
The train running time shows that, as the largest transport hub on BOLN high-speed rail - LanZhou West Railway Station, every day there will be east Darcy to the north and south, a total of 42 pairs of trains originating, ending or docked. Among them, "G" prefix EMU 11 pairs, "D" prefix, EMU 31 pairs of trains.
Lanzhou to the north, the upper and the wide, 9 to 11 hours "traffic circle" initially formed. According to the BOLN high-speed train plan, Lanzhou West to Beijing West action trains 1 pairs, G430 9:53 originating from the LanZhou West Railway Station, Beijing West Railway Station arrived at 18:53, the entire running time of 9 hours; G429 10:50 originating from the Beijing West Railway Station, LanZhou West Railway Station arrived at 20:00, running time of 9 hours and 10 minutes; the train travelling days, Xi'an south main dock North Luoyang, Longmen, Zhengzhou, Shijiazhuang East station.
BOLN high-speed rail operators to make Lanzhou as the hub of the northwest railway network is more perfect, the high-speed rail will change the northwest people travel, thus forming the world more and more small, the circle of friends is more and more big "9 to 11 hours north, on the broad city life" traffic circle, high-speed channel formation the new Silk Road, the economic and trade cooperation and cultural exchanges to speed up the northwest area and developed area, promote the building of great significance Silk Road Economic Belt.
"Silk Road high-speed rail" radiation more, traction Gansu into economic development "fast lane"". It is understood that in addition to the north, on the broad line EMU train, BOLN high-speed train running out, and more to enhance the national railway network transport capacity, in order to achieve a seamless docking, Gansu and many national inter city interconnection. Then, the LanZhou West Railway Station traffic hub in Gansu Province, will play an important role in the country "four vertical and four horizontal" layout of the road network in the eastern, central and western, to promote high-speed rail operation interoperability, provide strong transportation support for the economic development of western region, the "Silk Road high iron" - BOLN high iron like high-speed rotation the engine, pulling Gansu into the economic development of the fast lane".
High speed rail line "transit", to drive Lanzhou, Xi'an, Tianshui, Xining city". At this point, Lanzhou West to the north of Xi'an, the entire running time of approximately 3 hours, Lanzhou West to Xining, the entire running time of approximately 1 hours, West to the Lanzhou day Shuinan the entire running time of approximately 1.5 hours, to the north of Xi'an in southern Jiayuguan, the entire running time of approximately 8 hours, every day 7:00 22:00 time in the basic realization of the "bus" start, maximum density, the interval is only half an hour or so, to further expand the western city high-speed railway line between the "city effect", the real implementation of the morning visit the ancient capital of Xi'an, Tianshui Maijishan, noon tasting Lanzhou Hand-Pulled Noodle Soup with Beef, viewing the scenery of Qinghai, the desert night experience with the magnificent wish.
The train running time shows, Lanzhou West to Xi'an, north of EMU trains 33 times, with an average interval of 25 minutes, 1 times. Xi'an, north to Lanzhou, West EMU trains running 33 times, with an average of 22 minutes, 1 times. Between LanZhou West Railway Station and Tianshui south station, a total of 42 trains were operated, with an average interval of 19 minutes and 1 trips. Tianshui south station to LanZhou West Railway Station, a total of 41 times EMU trains, the average interval of 21 minutes, 1 times.
At the same time, XiAn North Railway Station to Xining Railway Station set up 7.5 pairs of EMU trains, stop at LanZhou West Railway Station. To effectively cope with the passenger travel peak, Lanzhou Railway Bureau will be added according to the actual situation of LanZhou West Railway Station to Zhengzhou east station G4286/5 EMU train 1 to meet the demand for passenger travel.